With its unique 'concept to commissioning' execution model that considers time, cost and quality parameters, Lanco is an established industry leader in executing large projects. The organization’s ISO 9001:2008 certified EPC division has several years of experience in civil construction projects and in implementing infrastructure projects in power, transmission, transportation and industrial sectors through the EPC route. With strong capabilities in complete infrastructure business value chain, the division has highly experienced professionals, and strategic relationships with critical national and international equipment manufacturers and consultants, which makes Lanco's EPC team a formidable force.
The organization has leveraged several years of experience gained through execution of various construction, infrastructure and power projects through the EPC route, to now extend its services to external customers at national and international level. With the three major external projects which are currently under execution- the2x600 MW Moserbaer project, the 3x 660 MW Koradi Thermal Power project and the 2 x 125 MW Akaz Power project in Iraq, Lanco aims to become a global EPC organization in the near future.
Areas of Operation
Lanco offers Engineering, Procurement and Construction services in the following infrastructure business segments:
|
|
- Power Projects: Coal, Gas, Hydro and Solar
- Transmission – Power , Water etc.
- Transportation – Roads, Metros etc.
- Industry projects – Manufacturing plants
- Building – Large scale building complexes, Hospitals etc.
|
|
Major Projects Executed:
Power - Thermal Power Projects, Hydro Power Projects, Chimneys, Cooling Towers & Balance of Plant, Transmission & Distribution |
|
|
|
|
|
|
|
|
|
|
|
Lanco Kondapalli gas based Power Project at Andhra Pradesh
|
|
120 MW Gas based Tanjore Power Project at Tamil Nadu
|
|
Lanco Udupi Power Project
an imported coal-based thermal power project at Karnataka
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lanco Amarkantak Power Project in Chhattisgarh, a coal fired thermal based project
|
|
Clarion Power Corporation Ltd
(12 MW)
|
|
Rithwik Energy Systems Ltd
(6 MW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
275m Double Flue Can Chimney for ANPARA-C
|
|
Kondapalli - Nuna Transmission Line |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
275m Twin flue/ Brick-lined chimnies for BHEL at Bellary, UKAI & North Chennai Projects |
|
Cooling Water Circulation System for NTPC at Ramagundam |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Others - Roads, Highways & Bridges, Metros & Railways, Buildings & Airports, Sea Ports & Marine Structures, Water & Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dalkhola-Islampore sub section II of NH 31
in the state of West Bengal
|
|
Construction of 81 KM of NH 4 from
KR Puram - Hoskote
|
|
Construction of 82 KM of NH 48 from
Bangalore - Devihalli |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EPC Contract for Construction of WTP, RWR and 100Km Pipeline for IL&FS at Paradip, Orissa |
|
Veeranam Project, 1875MM DIA, 114 KM Pipeline Chennai Metropolitan, Tamil Nadu
|
|
Terminal Building of Varanasi Airport
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Koparkhairane Railway Station for CIDCO
on Thane Belapur Road, Navi Mumbai |
|
Shastri Park Railway Station
for Delhi Metro Railway |
|
LANCO has bagged the order for Construction of New Airport Terminal Building for Biju Patnaik Airport (BBI), Bhubaneswar, Odisha |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Construction of Lanco Hills' Residential, IT Tower, Podium & Other Infrastructure |
|
Ashwini Hospital for the Navy, Mumbai |
|
|
|
|
|
|
|
|
|
- Lanco’s EPC Division bagged its first Metro Project on EPC basis from Chennai Metro Rail Limited for the Design & Construction of an elevated station at Meenambakam and Viaduct, Ramps, Cut & Cover Tunnel between OTA station and Chennai Airport Station. The Project has to be completed in 36 Months.
- Lanco’s EPC Division bagged its first 765kv transmission line (from Raigarh to Champa in Chhattisgarh state) from M/S. Power Grid Corporation of India Limited (PGCIL).
|
|
|
|
|
|
|
|